Project of the tunnel and the Abbasids Square

PROJECT DESCRIPTION

Traboulse built the Abbasids tunnel and added improvements to the Abbasids square.

Project of the Abbasid Tunnel in Damascus: It is a tunnel for cars with a total quantity of excavations 125000 m3 and a total quantity of 2500 m3 Beton implemented on the structure with ready-made concrete mold